|
Our Pantent
(Ideal systems/Costruction Joint)
|
|
...rly leveled sub-grade, ensuring that the upper edge of the joint is aligned with the desired height of the casting. Insert wooden picket troughs in the steel stirrups on both sides of the joint to res
|
|
25 Oct, 2007 |
|
|
|
The problem
(Ideal systems/Costruction Joint)
|
|
...ed joint is normally made using the following procedures:
1.Placing of a side formwork before casting the slab. The formwork must be vertical, straight and as high as the concrete slab.
|
|
20 Oct, 2007 |
|
|
|
|
Total 2 results found. Search for casting in IdealWork site with
|