|
...rical monuments, has recently seen approximately 6,000 m2 of Ideal Work’s stamped concrete floors laid in its historic centre. The work is part of a general improvement plan, devised and managed
|
|
The problem
(Ideal systems/Costruction Joint)
|
|
...o;. This is created by introducing horizontal metal bars (dowels), between two concrete slabs which are laid down at different times and aligned to be parallel in both the horizontal and the vertical
|