|
Our Pantent
(Ideal systems/Costruction Joint)
|
|
... HOW IT WORKS
In very long joints or in the case of crossing of two right-angled dowelled joints, the formation of cracks may occur due to restrained movements along th
|
|
25 Oct, 2007 |
|
|
|
The problem
(Ideal systems/Costruction Joint)
|
|
...n the slab by external loads.
Construction joints must allow horizontal displacement right-angled to the joint surface that is normally caused by thermal and shrinkage movement. At the
|
|
20 Oct, 2007 |
|
|
|
|
Total 2 results found. Search for angled in IdealWork site with
|