|
Our Pantent
(Ideal systems/Costruction Joint)
|
|
...igned with the desired height of the casting. Insert wooden picket troughs in the steel stirrups on both sides of the joint to resist the concrete movement.
A steel ring welded on both si
|
|
25 Oct, 2007 |
|
|
|
The problem
(Ideal systems/Costruction Joint)
|
|
...determined joint layout.
They must be designed in order to allow displacements between both sides of the slab but, at the same time, they have to transfer flexural stresses produced in th
|
|
20 Oct, 2007 |
|
|
|
|
Total 2 results found. Search for sides in IdealWork site with
|