Search
Any words All words Exact phrase
Search Keyword time
Total 24 results found. Search for time with

Results 1 - 24 of 24
1. FAQs
(Contractors Area/contractors)
...ze any type of colours? How long does it take to realize a stamped floor?  If, after some time, I had to decide to enlarge my floor, would I see any difference in colour between ol...

...ities for this important tourist seaside resort. The benefits offered by particularly short laying times (400 m2 pedestrian area were finished in 3-4 days), the moderate cost of supplies an...

...e had been seeking a foreign partner who could help us expand on the international market for some time” explains Luca Seminati, Managing Director of Ideal Work “and this opport...

4. Join us
(Trainig Course/Training Course)
... is approximately €60 - €120 per day We would suggest that you arrive at the hotel some time during the day before the training. The addresses for the hotels are: ALL'ARCO BED...

5. Ideal Hard
(Ideal Systems/Floor protection)
...r penetration; - Dust protection; - Floors are easy to clean; - Ideal Hard floors will polish over time with regular easy maintenance.   IDEAL HARD is safe to use. Its odourles...

6. Problems connected to traditional joints
(Ideal Systems/Constuction Joints)
... typically due to the thermal expansion and contraction or humidity induced shrinkage. At the same time it must not allow relative vertical transition and relative rotation due to traffic m...

7. Stamped concrete - Features and benefits
(Ideal Systems/Stamped Concrete)
...re and our products increase the abrasion resistance and seal the surface. Stamped concrete is timeless and will continue to look good for many years to come.     E...

8. Library "La Fornace"
(Reference/Decorative applications/Library "La Fornace")
Description: Restoration of  the external areas in Acid stain floor - 1200 mq. Location: Maiolati Spontini, Ancona (Italy) - 2007 Products used: Idea Floor (Pewter), Ide

9. Esselunga
(Reference/Industrial paving/Esselunga)
Description:  Ideal hard treatment in all areas of the distribution centres subjected to medium-to-heavy fork lift traffic - 55000 mq - 9000 mq. Location: Biandrate, Novara (Ita

10. Sanded strip joint
(products & tools)

11. Ideal Pu 78
(products & tools)
Two-component, transparent polyurethane paint.

12. Airless sprayer
(products & tools)

13. Roller tamp
(products & tools)

14. Winterpav
(products & tools)
Superplasticising admixture for concrete floors, for winter.

15. Archibeton
(products & tools)
Multifunction liquid admixtures for colour-conditioned concrete.

16. Summerpav
(products & tools)
Superplasticising admixture for concrete floors, for summer.

17. Sanded strip joint
(products & tools/Floor texture mats)

18. Ideal Pu 78
(products & tools/Sealers and coatings)
Two-component, transparent polyurethane paint.

19. Airless sprayer
(products & tools/Machines)

20. Roller tamp
(products & tools/Tools)

21. Winterpav
(products & tools/Decorative)
Superplasticising admixture for concrete floors, for winter.

22. Archibeton
(products & tools/Decorative)
Multifunction liquid admixtures for colour-conditioned concrete.

23. Summerpav
(products & tools/Decorative)
Superplasticising admixture for concrete floors, for summer.

24. Frequently asked question
(Category List)
...stamped floor change if exposed to sun? Ideal Work patterns and colours remain unchanged over the time as they are as one with the floor and not just overprinted. Moreover, they are resist...

1

Home | FAQs | Privacy | Site map |

© 2011 - Ideal Work Srl - All rights reserved - Ideal Work Srl - P.IVA 03293380261
via Kennedy, 52 - 31030 Vallà di Riese Pio X (TV) Italy | Tel. +39.0423.4535 | Fax +39.0423.748429 |